91ºÚÁÏÍø News - Bronfman Building /channels/news_feeds/all/term/Bronfman%20Building/rss en Construction starts: Bronfman Building – Modification of classroom locks /channels/channels/news/construction-starts-bronfman-building-modification-classroom-locks-372794 <div class="field field-name-body field-type-text-with-summary field-label-hidden"><div class="field-items"><div class="field-item even"><p>91ºÚÁÏÍø has mandated Les Entreprises NR Brosseau to carry out <strong>Project 18-010 Lot 3</strong> at the Bronfman Building on the Downtown Campus. The project involves modifying classroom locks to enhance classroom safety and allow doors to be locked from inside the classroom, either electronically or mechanically, in the event of an emergency.</p></div></div></div><div class="field field-name-field-primary-image field-type-image field-label-hidden"><div class="field-items"><div class="field-item even"><img class="no-float" src="/channels/files/channels/styles/wysiwyg_medium/public/channels/image/bronfman-facade-daytime-mcgill_aug24_2021_000_laurie_devine.jpg?itok=BCtJtHcP" width="160" height="107" alt="" /></div></div></div><div class="field field-name-field-published-date field-type-datestamp field-label-hidden"><div class="field-items"><div class="field-item even"><div class="custom-multi-date"><div class="multi-date first"><span class="label">Published: </span><span class="day">30 </span><span class="month">April </span><span class="year">2026</span></div></div></div></div></div> Thu, 30 Apr 2026 17:51:58 +0000 webfull 217942 at /channels Construction Start: Bronfman Building - Parking infrastructure /channels/channels/news/construction-start-bronfman-building-parking-infrastructure-348371 <div class="field field-name-body field-type-text-with-summary field-label-hidden"><div class="field-items"><div class="field-item even"><p>91ºÚÁÏÍø has mandated Concreate Construction<b> </b>to carry out the following project: Bronfman Building / 18-089 - Infrastructure for new parking equipment.</p> <p>The project consists of the reparation of the existing ramp to solve water infiltration issues and the installation of new upgraded parking infrastructure.</p> <p><strong>Project manager:</strong> André Labelle - <span><span>andre.labelle</span> [at] <span>mcgill.ca</span></span></p></div></div></div><div class="field field-name-field-published-date field-type-datestamp field-label-hidden"><div class="field-items"><div class="field-item even"><div class="custom-multi-date"><div class="multi-date first"><span class="label">Published: </span><span class="day">17 </span><span class="month">May </span><span class="year">2023</span></div></div></div></div></div> Wed, 17 May 2023 17:46:24 +0000 webfull 189699 at /channels Construction Start: Bronfman Building - Computer lab 045-046 /channels/channels/news/construction-start-bronfman-building-computer-lab-045-046-344297 <div class="field field-name-body field-type-text-with-summary field-label-hidden"><div class="field-items"><div class="field-item even"><p>91ºÚÁÏÍø has mandated Corenov Constructeurs to carry out the following project: Bronfman Building / 18-094 - Computer lab 045 -046.</p> <p>The project consists of transforming existing classrooms into two computer teaching labs with new audiovisual equipment and a reconfiguration. The scope includes the demolition of the back walls to include storage areas as part of the new teaching labs.</p> <p><b>Project manager: </b>Joé Normandeau (GPH Inc.) - <span><span>joe.normandeau</span> [at] <span>gph-inc.com</span></span></p></div></div></div><div class="field field-name-field-primary-image field-type-image field-label-hidden"><div class="field-items"><div class="field-item even"><img class="no-float" src="/channels/files/channels/styles/wysiwyg_medium/public/channels/image/rendering_bronfman_building_computer_lab_18-094.png?itok=CFYwHJCA" width="160" height="93" alt="" /></div></div></div><div class="field field-name-field-published-date field-type-datestamp field-label-hidden"><div class="field-items"><div class="field-item even"><div class="custom-multi-date"><div class="multi-date first"><span class="label">Published: </span><span class="day">14 </span><span class="month">December </span><span class="year">2022</span></div></div></div></div></div> Wed, 14 Dec 2022 15:06:06 +0000 webfull 185342 at /channels Construction Start: Bronfman Building - Dobson Center /channels/channels/news/construction-start-bronfman-building-dobson-center-343755 <div class="field field-name-body field-type-text-with-summary field-label-hidden"><div class="field-items"><div class="field-item even"><p>91ºÚÁÏÍø has mandated Construction SRJ to carry out the following project: Bronfman Building / 18-147 - Dobson Center project.</p> <p>The renovation of the western end of the ground floor of the Desautels Faculty of Management’s Bronfman Building (1001 Sherbrooke St West) comprises the creation of a new Dobson Centre; the redesign of the Faculty’s mailroom and exam spaces; and the full renovation of the floor’s public washrooms.</p> <p><strong>Project manager: </strong>Isabelle Girard, ing. PMP - <span><span>Isabelle.girard</span> [at] <span>gph-inc.com</span></span></p></div></div></div><div class="field field-name-field-primary-image field-type-image field-label-hidden"><div class="field-items"><div class="field-item even"><img class="no-float" src="/channels/files/channels/styles/wysiwyg_medium/public/channels/image/rendering_dobson_center_bronfman_building_18-147.png?itok=55lMo_-W" width="160" height="98" alt="" /></div></div></div><div class="field field-name-field-published-date field-type-datestamp field-label-hidden"><div class="field-items"><div class="field-item even"><div class="custom-multi-date"><div class="multi-date first"><span class="label">Published: </span><span class="day">22 </span><span class="month">November </span><span class="year">2022</span></div></div></div></div></div> Tue, 22 Nov 2022 22:11:38 +0000 webfull 184778 at /channels