91ºÚÁÏÍø News - pavillon Leacock /channels/fr/news_feeds/all/term/pavillon%20Leacock/rss fr 13 millions de dollars en dons pour transformer le Pavillon Leacock de 91ºÚÁÏÍø et soutenir la recherche et les connaissances autochtones /channels/fr/channels/news/13-millions-de-dollars-en-dons-pour-transformer-le-pavillon-leacock-de-mcgill-et-soutenir-la-335176 <div class="field field-name-body field-type-text-with-summary field-label-hidden"><div class="field-items"><div class="field-item even"><p>Le diplômé mcgillois Gerald Rimer et sa famille ont versé des dons totalisant 13 millions de dollars à l’Université afin de financer une partie des rénovations majeures du Pavillon Leacock et de jeter les bases du futur Institut de recherche et de savoirs autochtones à 91ºÚÁÏÍø.</p></div></div></div><div class="field field-name-field-primary-image field-type-image field-label-hidden"><div class="field-items"><div class="field-item even"><img class="no-float" src="/channels/files/channels/styles/wysiwyg_medium/public/channels/image/rimer-group.jpg?itok=IFUjK2ge" width="160" height="120" alt="" /></div></div></div><div class="field field-name-field-published-date field-type-datestamp field-label-hidden"><div class="field-items"><div class="field-item even"><div class="custom-multi-date"><div class="multi-date first"><span class="label">Publié: </span><span class="day">27 </span><span class="month">November </span><span class="year">2021</span></div></div></div></div></div> Sat, 27 Nov 2021 17:01:11 +0000 webfull 175153 at /channels Dec. 16, 2019 - Update on Leacock amphitheatre project /channels/fr/channels/news/dec-16-2019-update-leacock-amphitheatre-project-303967 <div class="field field-name-body field-type-text-with-summary field-label-hidden"><div class="field-items"><div class="field-item even"><p><b>Update on Leacock construction project </b></p> <p>The <a href="//www.mcgill.ca/construction/exterior/leacock-terrace-west-and-south">construction project</a> around the Leacock Building is advancing on schedule.</p> <p>The work carried out in the past few months included the demolition of the terrace and other concrete structures to the west and south of the building, excavation work and construction of a retention basin. We have also been repairing the exterior structural columns around the building.</p></div></div></div><div class="field field-name-field-published-date field-type-datestamp field-label-hidden"><div class="field-items"><div class="field-item even"><div class="custom-multi-date"><div class="multi-date first"><span class="label">Publié: </span><span class="day">9 </span><span class="month">January </span><span class="year">2020</span></div></div></div></div></div> Thu, 09 Jan 2020 16:06:47 +0000 webfull 157108 at /channels Aug. 14, 2019 - Leacock south terrace closed for next year /channels/fr/channels/news/aug-14-2019-leacock-south-terrace-closed-next-year-299573 <div class="field field-name-body field-type-text-with-summary field-label-hidden"><div class="field-items"><div class="field-item even"><p><strong>Aug. 14, 2019 - Leacock south terrace closed for next year</strong></p> <p>Starting the week of Aug. 19, 2019, the Leacock Building south terrace will be closed for construction. Pedestrians will still be able to walk between lower campus and McTavish Street using the McTavish Gates pathway.</p> <p>The Leacock Building will still be accessible from the stairwell, and Morrice Hall from McTavish Street. Reduced-mobility users will be able to enter Leacock using the east side ground-floor entrance.</p></div></div></div><div class="field field-name-field-published-date field-type-datestamp field-label-hidden"><div class="field-items"><div class="field-item even"><div class="custom-multi-date"><div class="multi-date first"><span class="label">Publié: </span><span class="day">14 </span><span class="month">August </span><span class="year">2019</span></div></div></div></div></div> Wed, 14 Aug 2019 20:44:05 +0000 webfull 151870 at /channels